-
Project Name: Natural Gas Distribution Network in Area of Eastern Delta
Country: Egypt Description: GAS TRANSMISSION: Main Feeder 60000/H (50 MMSCFD) 12”, 30 km High pressure gas pipeline Pig launching and receiving stations 8”/10”, 15 km Medium pressure pipeline Cathodic Protection GAS PRESSURE REDUCTION AND METERING STATION: No. 1 Station, 20000 SCM/H No. 1 Station, 40000 SCM/H City regulators 5000 SCM/H each Sector regulators 1000 SCM/H…
-
Project Name: Haud El Hamra-Arzew (OZ2) Crude Pipeline
Country: Algeria Description: Crude Oil Transmission Pipeline : 820 km 34” Pipeline with 28 Line Valve Stations No. 6 Pumping Stations with Electrical & Gas Turbine Pumps No. 16 Pig Launching and Receiving Stations Storage Tank Farm Upgrading Crude Filtering and metering Fuel Gas System For Turbo Pumps Electrical Power Generation SCADA – Telecom Civil…
-

Project Name: Gas Transmission Pipeline For Liberty Power Plant From Qadirpur to Daharki
Country: Pakistan Description: 12” Pipeline Gas Transmission System Gas Pipeline 12”, Pig Launching Facilities in Qadirpur, Pig Receiving Facilities in Daharki, Instrument Gas Skid in Qadirpur, Ancillary Building, Line Break Valves, Cathodic Protection, Instrumentation, Engineering & Procurement, Site Assistance & Startup Pipeline Performance Test Project Start – Completion Dates: 1997 – 1998
-

Project Name: Panjpir Gas Field- Gas Gathering System and Gas Transport Pipeline
Country: Pakistan Description: Engineering, Procurement and construction of: •No. 5 Gas Well-heads including Well-head Separators, Methanol Injection and Corrosion Inhibitor Injection •No. 6 6” Flowlines c/w Launching and Receiving Traps •No. 1 Gas Gathering Centre including Inlet Manifold, Three Phase Separators and Gas Dehydration •12” Gas Transport Pipeline c/w Lunching and Receiving Traps, LBV’s, Gas Metering…
-

Project Name: Fuel Gas Supply to RAS ABU Fontas “B”. Generation & Desalination Plant PH II Including Point “S” Upgrade
Country: Qatar Description: Gas Distribution Point “S” Upgrade of Existing Plant & Support Facilities ( Telemetry, Metering, etc.) New Pressure Let Down Station (Point W2) & Support Facilities ( Telemetry, Metering, etc.) Gas Transmission System Including: Gas Pipeline 30” and 24” Pig Launching Facilities Point S and Point W2 Telecommunication, Fiber Optic Link Engineering / Procurement…
-
Project Name: Gas System Rehabilitation Steam Boiler & Ancillary Equipment
Country: Pakistan Description: Design, Engineering & Supply of: Two Steam Boilers 177,000 LB/H Eight Boiler Feed Water Pumps Five Condenser Pumps Three Dearators Ancillary Equipment Project Start: December 1994 Project Completion: December 1997
-

Project Name: Sabiya Fuel Supply Pipelines
Country: Kuwait Description: Hot Oil Fuel Pipeline 16” – 86 Km. Gas Pipeline 42” – 86 Km. Pig Launching and Receiving Facilities Pumping Station: Metering, Pressure Control, Telemetry, Control System, Plant Utilities Engineering Procurement Services Site Assistance Start-Up Project Start : April 1994 Project Completion: December 1997


