Award: 2006
East System:
Al Ain and Oman border
• Provision of future new Compressor station
• Filtering
• Custody Metering
• Work shop building
• Modification to existing Al Ain Gas terminal
• Connection to existing lines by hot tapping
• Expansion of Control Building
• SCADA & Telecom works (New Optical Transport Network OTN)
West System
Al Maqta station
• Filtering, Pressure Reduction System (PRS) and Custody metering (ultrasonic type)
• Piping: Modification for Headers, piping, valves, tie –ins, including some Hot Tapping works…etc. in the range of 18” to 48”
• Buildings: New Administration building Control room, mosque, workshop & related electrical, F&G, furnishing, landscaping…etc.
• Miscellaneous civil, piping, electrical, utilities…etc works at station
• Modification at the tie in point of the New connection including new 48” traps and related piping
• Modification of existing sectionalizing valves to have remote operation capability
Jebel Ali Receipt station
• Filtering, Pressure Reduction System (PRS) and Custody metering (ultrasonic type) & 2×36” connection lines
Taweelah Power Station
• Filtering, Pressure Reduction System (PRS) and Custody metering (ultrasonic type)
• New 18” pipeline connection to new IWPP at Taweelah Receipt station.
For all stations:
• SCADA & related interface works at Al Ain, Maqta, Taweelah, Jebel Ali stations.
. New RTUs all complete with shelters (Either Active or Passively cooled) and Solar Panels.
. Telecom works: Replacement of OTNs at Dolphin Control Room and GASCO Control Room
. Real Time Data Base.
UAN Pipeline
• New 36” pipeline and related facilities from Maqta Gas Terminal to UAN East terminal.
• New 36” Connection from UAN east terminal to new consumer.
• Misc. Modification/jumper works on adjacent pipelines.